Reproduction

Reproduction

Reproduction

As one of Middlesex’s leading plasterwork mouldings specialists, we have invested decades into nothing but decorative plasterwork so that we are able to provide homeowners and commercial businesses from throughout the region with a truly expert service. From a beautiful cornice design to ornate wall panels; we provide an exceptional service for all our clients.

Thanks to our experience and dedication, we are capable of crafting unique designs or finding a variety of ways of bringing classics or damaged originals back to life. Be internal or external mouldings, we provide everything from the initial design to the installation or restoration of your plasterwork mouldings.

We work with a diverse range of architects, designers and property owners from private individuals to commercial businesses and trusts, providing everything from original reproductions for a new interior design to meticulous castings of original plasterwork moulds on conservation projects.

Our wide range of interior moulding restoration and reproduction services are able to replicate or repair any piece of moulding work. We have worked with different sizes to fit our clients plaster moulding requirements; no matter what the complexity of the piece we were reproducing. Throughout the years we have reproduced amazing ornate wall panels, cornices, decorative ceiling panels and a lot more so call us today on 01895 233027 to talk to the plasterwork moulding experts here at IPM.

Original Victorian and Georgian classic mouldings

We own a huge library of moulds including many antique originals which are ideal for refurbishments and conservation work, or even in the most modern of interiors needing that touch of organic decorative feature. A beautiful addition to any home, our astonishing plaster mouldings create an authentic and outstanding look for any property. Being bespoke designed also means that we are able to customise the design to your specific requirements.

From cornices and ceiling roses to ornate wall panels and covings; we offer a wide range of bespoke plaster mouldings that create an astonishing look, both internally and externally, for any property. Have a specific design in mind? Have a look through this site to view some of the designs we have to offer, but if it’s not there, we are more than happy to go through your requirements to make something completely bespoke.